| Transmission Lines
ACA Delivers NERC Mandate Compliance Projects to Large Utilities
In the last 6 months ACA has delivered multiple transmission line corridor projects to Utilities requiring high accuracy mapping and modeling. ACA provided total solutions that included:
- New LiDAR at +/- 30 Points Per Square Meter
- New Orthos at 2-6 Inch Pixels, Color and Color Infrared
- Point Data Accuracy of .25ft (X&Y)
- Weather Station Data Providing Wind, Temperature and More
- Ground Truthing and Critical Design Shots on the Structures
- Color Geo Tagged Oblique Imagery, Still and Video
- 3D planimetrics to Utilities Feature Codes
- PLS-CADD Method 1 Modeling including Finite Element Analysis
- IEEE 738-2006 Conductor Modeling, Temperature, SAGS, and Tensions
- NESC Clearance Violation Reporting
- Auto CADD Plan and Profile Sheets for Design and Vegetation Maintenance
|